Weekday Rides

Tuesday Morning – “Leon Creek Greenway Ride”

Time: 9 AM – Start on October 24
Place: Ride starts at the Mainland Trail-head (off of Mainland; behind Walmart). This is a 27 mile ride along a paved, shaded path that follows Leon Creek.
Ride Length 27 Miles. This ride is suitable for all levels
Directions Ride starts at the Mainland Trail head (off of Mainland behind from Walmart).
Ride Leader Vivian Perez (210) 387-5130, artista72@satx.rr.com or Ann Caldwell (210) 508-8878, robancald@yahoo.com

Thursday Morning – “Leon Creek Greenway Ride”

Time: 9 AM – Start on October 19
Place: Ride starts at the Mainland Trail-head (off of Mainland; behind Walmart). This is a 24 mile ride along a paved, shaded path that follows Leon Creek.
Ride Length 27 Miles. This ride is suitable for all levels
Directions Ride starts at the Mainland Trail head (off of Mainland behind from Walmart).
Ride Leader Ann Caldwell (210) 508-8878, robancald@yahoo.com

Friday Morning – “Castroville Ride”

Time: 8:00 AM
Place: Meet at Sammy’s Restaurant parking lot.  Beginner’s Ride.
Ride Length Beginner’s Ride.  About 30 miles of mostly flat roads from Castroville to Lytle and back.
Directions To get there, go West on US-90 to Castroville, at the third light you’ll see Sammy’s on the left, we’ll meet in the parking lot on the west side of the building.
Ride Leader Vivian Perez (210) 387-5130, artista72@satx.rr.com